Approach to Implementing Health and Environmental Safety System in Construction Projects Using Fuzzy Logic

International Journal of Innovation in Engineering 2022 3 citations ? Citation count from OpenAlex, updated daily. May differ slightly from the publisher's own count. Score: 35 ? 0–100 AI score estimating relevance to the microplastics field. Papers below 30 are filtered from public browse.
Hossein Jafari, Mohammad Ehsanifar

Summary

Researchers investigated the implementation of a Health and Safety Executive plan in civil construction projects using fuzzy logic, applying Work Breakdown Structure and time planning methods to evaluate and improve occupational health and environmental safety management systems on construction sites.

The present study's objective is the implementation of the general Health and Safety Executive(HSE) Plan in civil projects; at first, it is required to formulate the Work Breakdown Structure(WBS) in the relevant project with the aim of coming to a proper time plan. In this study, the scope of the implementation of this system includes two items in which the probability and risks of timing projects can come to light.The two substantial items in timing projects are activity and time itself which, in some projects, given the un-clarity of the scope of these two items, one is required to take into consideration the probable and approximate value of such scope with the analysis of the fuzzy expert method. And, one of the methods used for the analysis of the scope of timing probabilities is the use of the practical implications of fuzzy logic in engineering sciences; thus, in the essay at hand, the basic information required for risk assessment, fuzzy logic, the theory of fuzzy numbers, and the method used for analyzing, disintegrating, and composing them, with the purpose of applying them in projects' risk assessment, is presented.Fuzzy logic can be introduced as a powerful and flexible tool for analyzing the scope of risk of projects which is enabled to provide us with the mathematical formulation of the unclear or unspecific parameters and, eventually, represent the analysis and evaluation of data in a numerical format.

Sign in to start a discussion.

More Papers Like This

Article Tier 2

Ecological Problems in Ocean Engineering Construction Based on Fuzzy Recognition

This paper examines ecological and structural health monitoring challenges in ocean engineering construction, proposing a fuzzy identification-based approach to assess environmental risk events and structural damage in marine structures subjected to corrosion, material aging, fatigue, and long-term load effects.

Article Tier 2

The Dimensional Effect of Optimal Project Risk Management Practices on Project Quality of Selected Construction Companies in Nigeria

This study examined how effective risk management practices in construction projects influence project quality, finding that addressing risk dimensions systematically improves outcomes across cost, time, and quality parameters. The research is focused on construction project management rather than environmental contamination.

Article Tier 2

Enhanced Entropy-Fuzzy Integration Decision Support System for Risk Assessment and Management of Hydraulic Engineering

Researchers developed an Enhanced Entropy-Fuzzy Integration Decision Support System for risk assessment and management of hydraulic engineering projects in the context of climate change and increasingly complex water resource management. The system addresses limitations of traditional probability-based risk methods by incorporating fuzzy logic to handle ambiguous and uncertain risks.

Article Tier 2

Holistic Algorithms for Examining the Non-Performance of Lean Method of Construction for Accelerating Efficient Utilization of Lean Construction Methods in Ghana

Researchers investigated the barriers to adoption of lean construction methods in Ghana using a mixed-methods approach combining questionnaires with NVivo 11 qualitative analysis. The study identified key non-performance factors limiting efficient and sustainable project delivery among operational managers and construction industry personnel.

Article Tier 2

Construction of Water Pollution Prevention and Control Project of Urban Sewage System Based on Feature Selection Algorithm and Machine Learning

This is a technical planning document related to the design and construction of urban sewage treatment infrastructure for water pollution prevention and control. It is not a primary research article.